Category: | Cycleway: A problem that needs to be fixed |
Tags: | None |
Date time: | 2.18pm, Sunday 9th March, 2008 |
Time line: | Earlier | Later |
Facing: | West |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | Tim Burford |
Area: | Southwark |
Munton Road, Elephant and Castle cycle bypass?? - a contraflow track just ends without even a drop-kerb, with a choice of two no-entry roads!
Comments reflect the views of the original submitter only.