Category: | A route temporarily barred to cycle access.: Event or temporary issue |
Tags: | flooding, york |
Date time: | 9.19am, Wednesday 12th February, 2020 |
Time line: | Earlier | Later |
Facing: | East |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | timbo/rob |
Area: | Haxby |
Flooded riverside route in York
Comments reflect the views of the original submitter only.