Category: | Cycleway: Other (infrastructure-related) |
Tags: | uruguay |
Date time: | 1.00pm, Sunday 24th November, 2019 |
Time line: | Earlier | Later |
Facing: | North east |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | timbo |
End of shared-use path by the main road north from La Paloma, Uruguay (on the line of the old railway, I think)
Comments reflect the views of the original submitter only.